热99re久久精品这里都是精品免费-少妇爆乳无码av无码波霸-欧美人与动牲交精品-aⅴ网站在线观看-狠狠干b-日韩激情网址-亚洲成av人片在线观看ww-欧美视频网站-激情春色网-国产女人高潮抽搐叫床视频-人人射人人插-成年性生交大片免费看-久久久夜色精品-久久aⅴ乱码一区二区三区-日韩和的一区二区-亚洲精品国产av现线-天天干在线播放-99久热-亚洲色欲色欲www在线看-亚洲大尺度无码专区尤物

Contact Us

Inflatable Air Blower cleaning process

Date: 2015-1-5   Click: 1603 Times

Finishing "Inflatable Air Blower" must pay attention to the fan power cord and clip the button, the line to be sorted out in advance, do not let the fan run when working on the line to produce a variety of contact, the power cord is in the initial position of the fan in general (both removed available).
Adjust the position of the radiator
The radiator tune in the right place, the place "Inflatable Air Blower" level to the processor port cover side, four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. The radiator tune into the right position, the fan will be placed horizontally to cover the processor port side, the four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. Motherboard Intel processor buckle hole distribution in the vicinity of the CPU socket, the user can easily observe the board found. Intel original radiator have to look at before installing rotary switch is fully restored in situ. "Inflatable Air Blower" As a result of the heat sink clip clip pressed four buckle design, so the best way is to install the clip "diagonal" push installation method. Order push uneven force likely to cause the fan, causing the other two buckle pressing difficulties.

Back to: Industry news

+86-0769-83660708

Home Product News Contact