热99re久久精品这里都是精品免费-少妇爆乳无码av无码波霸-欧美人与动牲交精品-aⅴ网站在线观看-狠狠干b-日韩激情网址-亚洲成av人片在线观看ww-欧美视频网站-激情春色网-国产女人高潮抽搐叫床视频-人人射人人插-成年性生交大片免费看-久久久夜色精品-久久aⅴ乱码一区二区三区-日韩和的一区二区-亚洲精品国产av现线-天天干在线播放-99久热-亚洲色欲色欲www在线看-亚洲大尺度无码专区尤物

Contact Us

Blower Fan check start

Date: 2016-5-31   Click: 1734 Times

Check to make sure the fan is to start, press the start button, "Blower Fan" into the start procedure: ① auxiliary pump pre-lubricated one minute (auxiliary pump operation the green light). ② "Blower Fan" to start the operation (blower running green light). ③ relief valve was slowly closed (pressure relief valve green light is off, two minutes after the pressure relief valve is closed green light). ④ auxiliary pump is stopped (auxiliary pump operation indicator is off, stop the red light). So far, the blower starts successfully, it can be put into formal operation. ⑤ After such press the start button, "Blower Fan" failed to start as scheduled, the low oil pressure alarm one minute after the red light, the entire start-up process is stopped. Determine the cause is resolved, restart eliminate the alarm.

Back to: Industry news

+86-0769-83660708

Home Product News Contact