热99re久久精品这里都是精品免费-少妇爆乳无码av无码波霸-欧美人与动牲交精品-aⅴ网站在线观看-狠狠干b-日韩激情网址-亚洲成av人片在线观看ww-欧美视频网站-激情春色网-国产女人高潮抽搐叫床视频-人人射人人插-成年性生交大片免费看-久久久夜色精品-久久aⅴ乱码一区二区三区-日韩和的一区二区-亚洲精品国产av现线-天天干在线播放-99久热-亚洲色欲色欲www在线看-亚洲大尺度无码专区尤物

Contact Us

Industrial Ventilation Fan tips

Date: 2014-10-13   Click: 1724 Times

Before "Industrial Ventilation Fan" installation
1, the fan should be checked before installing it is intact, fastener bolts are loose or fall off, if collisions impeller cover. Carefully check the fan or blinds during transport without deformation damage.
2, the installation select export environment, you should pay attention to the socket can not have too much ~ ~ face obstacles in 2.5-3M's.
When "Industrial Ventilation Fan" installation
A smooth installation: the installation should pay attention to the horizontal position of the fan, the fan and mounting the motor to adjust to a solid foundation can not have tilted horizontal plane.
2, the fan should be installed so that the motor in position adjustment bolts, easy to operate. Adjust the belt tension when convenient to use.
3, when installing the fan bracket, be sure to let stand firm and level ground plane, reinstall the angle iron reinforcement if necessary, the next fan.
4, after installing the fan, check the tightness around. If this gap is, the available solar panels sealed plastic or glass.
After installation "Industrial Ventilation Fan"
1, after the installation is complete, check the internal fan to stay estate tools and debris. Hand or toggle lever blades, check whether tight or collision phenomenon, whether the project did not interfere with the rotation of the test run before the exception.
2, in operation, if there is vibration or fan motors have "buzz" abnormal sounds or other anomalies, should stop to check, repair, and then get started.

Back to: Industry news

+86-0769-83660708

Home Product News Contact